← CarreiraAI
Indeed
Presencial

Lead Mechanical Engineer, Methods and Tooling

GE Vernova · Boston, MA · Brasil

Publicada em 23/06/2026

Candidatar-se com o CarreiraAI →
Job Description SummaryThe Tooling Method & Design Main Project Engineer will join the Tooling team within Engineering department, who is responsible for technical studies and design of tools for transportation and erection of main pieces of equipment constituting a hydropower plant (embedded parts, turbine, generator, valves and hydromechanical).He or she will take the responsibility on project to define the methods for handling, transport and support Turbine and Generator components for projects. It means he will be in charge to collect the information from site, COEs, project team, in order to imagine the tools to do the erection and maintenance operation according to the relevant procedure. He will have to perform design and calculation notes of part of the tooling he will have defined by following a structured design process. He or she will be specifically in charge of project execution for awarded projects in North America region, with a focus on design Validation (US stamp Mandatory).Job DescriptionEssential ResponsibilitiesFor a given project in execution, collecting the information from site / Project Engineering Manager / logistics / Center of excellence to prepare the synopsis (sequence of installation/maintenance) and lashing (transport) drawingsImagining the erection and maintenance operation according to the procedure (done by site team) with the objective to use as much as possible standard tools and according to the EHS rules.Perform the calculation and the design of the tools according to the CoE's Design Practices and with the validation of the tooling principal engineerRepresent the Tooling Center of Excellence (CoE) in front of the Project Team: System Integrator, CoE main project engineers, Supply Chain and Construction & CommissioningCoordinate within the Tooling CoE the calculation and design of the full list of tools identified during synopsis phase (detailed transportation & erection sequence of the power plant) - fulfilling plan
Candidatar-se com o CarreiraAI →